Instruktsiia Po Ustanovki Dveri Kupe May 2026

: Screw the roller brackets to the top (and sometimes bottom) of the door panels, usually 1–1.5 inches from the side edges. Mount the Panels :

For , align the lower track with the top one using a level or plumb line. instruktsiia po ustanovki dveri kupe

: Turning these screws clockwise or counter-clockwise will raise or lower that side of the door to make it plumb. : Screw the roller brackets to the top

: Use a level or plumb line to ensure the side walls and floor are perfectly horizontal and vertical. : Use a level or plumb line to

: If the door doesn't sit flush against the wall, locate the adjustment screws on the bottom rollers.

Lift the (the one further inside the closet) first.

: Measure the opening in three places (top, middle, bottom for width; left, center, right for height).


scroll up